Merit3D

AS9100 REV D · ISO 9001:2015 · ITAR REGISTERED · MADE IN PRICE, UTAH 833-341-2335  ·  SALESSUPPORT@MERIT3D.COM

Free tool — no signup, nothing tracked

Injection Molding Break-Even Calculator

Slide your tooling cost, unit costs, and volume and watch the crossover move. Flip to Pro to type the exact numbers off your quotes — ours or any vendor’s — or estimate mold economics straight from your part’s dimensions. Toggle Overseas to see what container freight and duties really do to the math. Powered by the same cost model as our instant estimate tool.

Interactive — run your own numbers



MOLD RUNS:

Mold / tooling cost
Molded cost per part
Printed cost per part
Your annual volume

EXACT NUMBERS OFF YOUR QUOTES — OURS OR ANY VENDOR’S. FREIGHT + TARIFF COUNT ONLY WHEN “MOLD RUNS: OVERSEAS”.

No mold quote yet? Estimate one from your part

ADJUST THE PART AND THE MODEL FILLS TOOLING + MOLDED COST ABOVE. THE PART SIZE ALSO SETS CONTAINER FILL FOR OVERSEAS FREIGHT.

 naive break-even

TOOLING ÷ (PRINTED $/PART − MOLDED $/PART) · UNIT-COST MATH ONLY — THE FOUR FACTORS BELOW MOVE THE REAL ANSWER

The chart is the easy part

Unit-cost math captures maybe a third of the real decision. The other two-thirds:

Lead time

Mold tooling runs 8–16 weeks to first shot. Additive is days. Sometimes molding isn’t more expensive — it’s unavailable.

Design revisions

$2,000–$8,000 per mold change, versus uploading a new STL. Most first-year products revise two or three times.

Inventory risk

Molds amortize through big batches — months of parts bought up front, whether or not they sell.

Cash flow

Tooling is due before the first part ships. Additive is pay-as-you-go.

These usually move the effective break-even 3–5× above the naive number. The full argument, worked examples, and the honest list of where molding still wins: 3D printing vs injection molding — the volume math that wins.